Project

Orotex - Beaulieu International Group

Flat roofs

The existing roofs were renovated by overlaying them with bituminous waterproofing, supplemented with liquid waterproofing around the drains and air vents. This roof structure guarantees long-term waterproofing and increased reliability of the roofing system.

500 lm new skylights

In addition to the roof renovation, Tectum Group was Tectum Group responsible for installing new skylights. A total of 500 linear meters of skylights were integrated, providing more natural light and improved comfort in the production halls.

The works ran from November 2024 to April 2025 and were carried out with particular attention to planning, safety, and minimal disruption to the client's activities. The work was carried out by Tectum Dekkers Hoboken, which Tectum Group for the entire coordination and realization of the project within Tectum Group .

Any future project on the horizon?
Let's build together

Renovation of flat roofs Orotex

In Oostrozebeke, Tectum Group carried out Tectum Group large-scale renovation of the flat roofs of Orotex, part of Beaulieu International Group. The project involved the renovation of no less than 17,000 m² of roof surface and required a sustainable and future-proof solution, tailored to the continuity of industrial activities on the site.

Project Sheet
Location
Oostrozebeke
Construction period
2024 - 2025
Services
Flat roofs
Roof area
17,000 m²
Category
Industry
Client
Beaulieu International Group
Head contractor
Tectum Dekkers Hoboken
Architect
Stability

The existing roofs were renovated by overlaying them with bituminous waterproofing, supplemented with liquid waterproofing around the drains and air vents. This roof structure guarantees long-term waterproofing and increased reliability of the roofing system.

500 lm new skylights

In addition to the roof renovation, Tectum Group was Tectum Group responsible for installing new skylights. A total of 500 linear meters of skylights were integrated, providing more natural light and improved comfort in the production halls.

The works ran from November 2024 to April 2025 and were carried out with particular attention to planning, safety, and minimal disruption to the client's activities. The work was carried out by Tectum Dekkers Hoboken, which Tectum Group for the entire coordination and realization of the project within Tectum Group .

No items found.
Any future project on the horizon?
Let's build together

Renovation of flat roofs Orotex

In Oostrozebeke, Tectum Group carried out Tectum Group large-scale renovation of the flat roofs of Orotex, part of Beaulieu International Group. The project involved the renovation of no less than 17,000 m² of roof surface and required a sustainable and future-proof solution, tailored to the continuity of industrial activities on the site.