The existing, less effective insulation was replaced with 12 cm of PIR insulation, finished with a two-layer bituminous waterproofing membrane with white slate granules. In addition, we installed four BIBO blocks as permanent fall protection, ensuring that the technical systems on the roof remain safely accessible for maintenance.

As with many renovation projects, the challenge lay in keeping the building watertight during construction. Coordination with the mechanical and electrical subcontractor, as well as the complex connections to existing skylights and facade finishes, also required extra attention. Thanks to thorough preparation and close collaboration, the work proceeded smoothly and was completed well ahead of the scheduled deadline.

Any future project on the horizon?
Let's build together

For the renovation of Vanhout’s headquarters in Geel, Tectum Group refurbished Tectum Group ,500 m² of flat roofs. The existing roof structure was completely removed and replaced with a high-performance solution that better protects the building against heat loss and prepares it for the future.

The work took place between mid-March and the end of May and was completed well ahead of the scheduled deadline.

Project Sheet
Location
Yellow
Construction period
March–May 2026
Services
Flat roofs
Fall Protection
Roof area
1,500 square meters
Category
Office
Client
Vanhout
Head contractor
Tectum Constructors Genk
Architect
/
Stability
/

The existing, less effective insulation was replaced with 12 cm of PIR insulation, finished with a two-layer bituminous waterproofing membrane with white slate granules. In addition, we installed four BIBO blocks as permanent fall protection, ensuring that the technical systems on the roof remain safely accessible for maintenance.

As with many renovation projects, the challenge lay in keeping the building watertight during construction. Coordination with the mechanical and electrical subcontractor, as well as the complex connections to existing skylights and facade finishes, also required extra attention. Thanks to thorough preparation and close collaboration, the work proceeded smoothly and was completed well ahead of the scheduled deadline.

Our people make the difference

This project not only showcases the craftsmanship of Tectum Group, but also demonstrates how we invest in the people behind our projects. Among those working on this job site were Laurens and Oleksi. Through the Tectum Group free training program for flat-roof roofers, they Tectum Group their first steps in the industry and are now contributing to challenging projects such as this renovation in Geel.

In the video accompanying this project, they talk more about their journey from training to the construction site.

👉 Interested in a career as a roofer? Learn all about our free training program for flat-roof roofers and sign up here.

No items found.
Any future project on the horizon?
Let's build together

For the renovation of Vanhout’s headquarters in Geel, Tectum Group refurbished Tectum Group ,500 m² of flat roofs. The existing roof structure was completely removed and replaced with a high-performance solution that better protects the building against heat loss and prepares it for the future.

The work took place between mid-March and the end of May and was completed well ahead of the scheduled deadline.